Global-Tubing Midland Service Center

Global Tubing’s Midland Service Center Celebrates 2 years of Goal Zero

Congratulations to our Midland Service Center team for achieving #GoalZero 2 years in a row – meeting the high safety standards of zero recordable injuries and zero high potential incidents. This was achieved through outstanding leadership and each employee’s dedication to working safely. We are proud of our Midland Service Center for this great achievement and commend them for their unwavering commitment to delivering safe, timely, and reliable coiled tubing services to customers throughout the region. Great way to kickoff #NationalSafetyMonth. Stay safe and keep up the tremendous work! #coiledtubing #safety #midland #odessa

Coiled Line Pipe, Gaslift Operations in the Permian Basin

Major E&P operators trust in Global Tubing’s coiled line pipe (CLP) for gas-lift operations in the Permian. Utilizing a fast and cost-efficient deployment and installation of 4.5″ OD Sch40 (WT 0.237″) coiled line pipe, our clients achieve initial production (IP) goals much sooner and with considerably lower long-term OPEX. Learn more about the advantages coiled line pipe can provide to your operations via our Global Tubing  Coiled Line Pipe page. #coiledlinepipe #gaslift #permian #innovation

Northeast Colorado Flowlines and Gaslift

Coiled Line Pipe provides a better, faster and more cost efficient way to install X52C steel line pipe.

Project Overview

A large, independent, oil and gas company, based in Houston, TX had a field development that required a safe, quick, and cost-efficient steel flowline installation. There were 7 new wells that needed to be tied into a central gathering facility. Coiled Line Pipe was selected as the solution that provided the greatest cost benefit, highest safety potential and improved product performance as compared to the usual stick steel pipe.

Project Highlights

  • The field development required seven (7) new flowlines and one (1) gas lift pipeline to tie the new well back to the central gathering facility.
  • Global Tubing answered the needs of the customer by supplying 51,000 ft of Coiled Line Pipe from stock to deliver the entire quantity requested on thirty-four (34) spools.
  • The Coiled Line Pipe was strung onto the right-of-way in only 4.5 days, significantly faster than stick steel pipe.
  • Eliminated the need for at least 16 fittings along the route by sweeping the continuous lengths of Coiled Line Pipe around one of the P.I.’s and onto the well pads.
  • The entire pipeline length required only (32) welds to complete the same scope on the right-of way that would have required at least (1300) welds for traditional stick pipe for a 97.5% reduction
    in total number of welds.

Conclusion

Global Tubing’s Coiled Line Pipe supplied a no hassle solution for the field needs of the client. Cost Savings of over the steel pipe installation were delivered upon project completion.

By using Coiled Line Pipe, every client can enjoy the peace of mind that only steel pipe’s long history and specification compliance can provide and combine it with the cost savings of a spool-able pipeline.

PROJECT

New, well-to-facility gathering flowlines

LOCATION

Plains of Northeastern Colorado

APPLICATION

Crude Oil – Multiphase

MATERIAL SPECIFICATION

3″ Nominal OD,
Schedule 80 (0.300″ wall thickness)
A53/X52C Coiled Line Pipe with 3 Layer Polypropylene Coating

LENGTH

51,000 feet

Global Tubing partners with Gladiator Energy Services

Continuing our commitment to innovation, Global Tubing is proud to partner with Gladiator Energy to set coiled tubing accessibility records in super lateral wells. The 2.625” OD CT string boasts 29,000-feet of continuous length and was engineered and manufactured by our experts in Dayton, TX. This string is considered the heaviest and longest string in 2.625” OD on record for use in US shale basins. Gladiator Energy has been able to successfully reach target depths, drilling over 76 plugs in 16,000+ feet lateral wells in record time. #coiledtubing #innovation #extendedreach #engineeredsolutions

Global Tubing partners with Cudd Energy Services Pressure Control

Global Tubing, a Forum Energy Technologies Company, and Cudd Energy Services Pressure Control are jointly delivering innovative solutions supporting the challenging growth of lateral lengths in horizontally drilled wells across all US basins. The 26,660’ string of 2 5/8” DURACOIL130 Grade Coiled Tubing, designed in partnership with the Cudd engineering team, is manufactured in the US by our dedicated Dayton staff and reaches beyond convention to deliver industry-leading results. #CoiledTubing #ExtendedReach #OilandGas #MadeintheUSA

New CO2 Injection System Flowlines

Coiled Line Pipe provides a better, faster, and more cost-efficient way to install steel line pipe for CO2 injection system flowlines.

Project Overview

A large, publicly traded, independent oil and gas company, has an expansive midstream multiphase field development that requires a safe, quick, and cost-efficient steel flowline installation. The pipeline system has several road & pipeline crossings, a directionally drilled bore river crossing, and multiple mobilizations. Coiled Line Pipe has been chosen as the preferred solution that can provide the greatest cost benefit, highest safety potential and improved product performance as compared to the usual stick steel pipe and other non-steel flowline alternatives.

 

Project Highlights

  • Large gathering system to connect three (3) different units.
  • Traversing several sensitive BLM land areas with reduced impact using Coiled Line Pipe
  • 47 injection wells
  • A river crossing to be accomplished with HDD
  • Numerous road crossings
  • Global Tubing is prepared to fulfill the needs of the customer by supplying 140,000 ft of Coiled Line Pipe on 60 spools in staggered, on demand, deliveries to a centrally located pipe yards to be
    dispersed to specific sites, as needed.
  • The Coiled Line Pipe installation from unloading to ditch is 3 times faster than stick steel pipe, require 65% less man hours, and has a reduced impact to sensitive areas due to more limited right
    of way requirements.

 

Conclusion

By using Coiled Line Pipe, every client can enjoy the peace of mind that only steel pipe’s long history and specification compliance can provide and combine it with the cost savings of a spool-able pipeline. Cost Savings over the steel pipe installation will make large projects like this one more feasible, even in a challenging market and economy.

PROJECT

New CO2 Injection System Construction

LOCATION

Baker, Montana

APPLICATION

Gas Injection Flowlines

MATERIAL SPECIFICATION

4″ Nominal OD (4.5″ Actual OD),
Schedule 40 (0.237″ wall thickness)
3″ Nominal OD (3.5″ Actual OD),
Schedule 40 (0.216″ wall thickness)
2″ Nominal OD (2.375″ Actual OD),
Schedule 40 (0.154″ wall thickness)
All X52C Coiled Line Pipe with 3 Layer Polypropylene Coating

LENGTH

4″ S/40 – 35,000 feet
3″ S/40 – 57,000 feet
2″ S/40 – 47,000 feet

Crude Oil Flowline Solution Case Study (Eagle Ford)

Crude Oil Flowline Solution (Eagle Ford)

Coiled Line Pipe provides a better, faster and more cost efficient way to install steel line pipe in the Eagle Ford.

global tubing coiled line pipe case study
global tubing coiled line pipe case study

Project Overview

A large, independent, oil and gas company, based in Oklahoma City, OK had a field development that required a safe, quick and cost efficient steel flowline installation. The pipeline had multiple road and pipeline crossings and lengthy directionally drilled bores. The Right of Way included a challenging, wetland environment requiring 1400ft bores and installation flexibility on multiple pipeline crossings. Coiled Line Pipe was selected as the solution that provided the greatest cost benefit, highest safety potential and improved product performance as compared to the usual stick steel pipe.

Project Highlights

  • Global Tubing answered the needs of the customer by supplying 11,600 ft of Coiled Line Pipe from stock to deliver the entire quantity requested in eight (8) spools only.
  • The pipe was delivered to site, the Coiled Line Pipe installation from unloading to ditch was 3 times faster than stick steel pipe.
  • The entire pipeline length required 14 welds (including the riser connections, pipeline crossings and road bores).
  • 8 pipeline and road crossings were completed successfully, by pushing and/or pulling the required pipe length in place, while deploying into the ditch and electrostatically testing the coating for damage at the same time.

Conclusion

Global Tubing’s Coiled Line Pipe supplied a no hassle solution for the field needs of the client. Cost Savings of over the steel pipe installation were delivered upon project completion.

By using Coiled Line Pipe, every client can enjoy the peace of mind that only steel pipe’s long history and specification compliance can provide and combine it with the cost savings of a spoolable pipeline.

PROJECT

New, well-to-facility gathering flowline

LOCATION

Big Wells, Texas

APPLICATION

Crude Oil – Multiphase

MATERIAL SPECIFICATION

4″ Nominal OD, Schedule 40
(0.237″ wall thickness)
A53/X52C Coiled Line Pipe
3 Layer Polypropylene Coating

LENGTH

11,600 feet

Crude Oil Flowline Solution Case Study (Eagle Ford)
Crude Oil Flowline Solution Case Study

Crude Oil Flowline Solution

High quality, cost efficient, flowline solution delivers when timing is of the essence.

Project Overview

A locally owned E&P company with a focus on highly productive assets in Mississippi and Louisiana. The company had been using blue-band tubing; threading up and tag welding the tubulars for flowlines from wellhead to gathering tanks and batteries. On this project, the company needed a different solution due to the location of the well, which was subject to review by the Army Corps of Engineers.

The wellhead was set inside the river’s floodplain and unusually high river conditions limited access to the lease to a window of no longer than three weeks in late August.

Utilizing Coiled Line Pipe from Global Tubing, the client installed 17,230 feet of pipe in just three days. The deployment was rather complex and involved six (6) lines located side-by-side, six (6) cased hole pulls and four (4) futures deployed for future tie-in potential.

The Coiled Line Pipe deployment crew consisted of two installation specialists and two pieces of equipment that were mobilized with less than a 48-hour notice from Global Tubing’s main manufacturing and support facility in Dayton, TX.

Project Highlights

  • High-quality product required at competitive cost.
  • The project window was less than 14 days, yet it took only 5 business days from mobilization to de-mobilization of all assets to and from site.
  • The actual pipe stringing took 3 days only with 5,700 feet on average installed per day.

Conclusion

Coiled Line Pipe delivers unprecedented speed of installation for steel pipelines by reducing the intensity of stringing, handling, boring and welding operations by nearly 90%. It is the optimal solution for flowlines where cost, time and efficiency of the essence.

PROJECT

Crude Oil Production

LOCATION

Laurel, Mississippi

APPLICATION

Crude Oil – Multiphase
and Gas-Lift Lines

MATERIAL SPECIFICATION

2 ½” Nominal OD,
Schedule 40, A53B/X52C, 3LPP

LENGTH

17,230 feet

Crude Oil Flowline Solution Case Study
DJ Basin Multi Flowline Project Case Study

DJ Basin Multi Flowline Project

Coiled Line Pipe provides 40% cost savings and a better, faster and more cost efficient way to install steel line pipe in the DJ Basin.

coiled line pipe
coiled line pipe installation
coiled line pipe installation

Project Overview

A large, independent, oil and gas company, based in Houston, TX had a field development that was falling behind schedule due to facilities being complete, but flowlines from the pads taking too much time to build. The customer required a safe, quick and cost efficient steel flowline installation. After rigorous vetting from procurement, engineering and material specialists from the customer, Coiled Line Pipe by Global Tubing was selected as the best solution to replace seamless steel pipe.

 

Project Highlights

  • Global Tubing provided 22 reels of 3,700 ft each of Coiled Line Pipe from stock to quickly deliver the quantity requested by the customer.
  • The Coiled Line Pipe installation, from unloading to ditch, was 4 times faster than stick steel pipe.
  • The entire project had 30 welds as compared to 2000 with steel line pipe.

 

Conclusion

Global Tubing’s Coiled Line Pipe was the most suitable solution for the customer, catching up to schedule and even completing ahead of time and below budget with no compromise to safety and integrity.

PROJECT

New, well-to-facility, multiple gathering flowlines

LOCATION

Fort Lupton, Colorado

APPLICATION

Crude Oil – Multiphase
MATERIAL SPECIFICATION
2″ Nominal OD,
Schedule 80 (0.218″ wall thickness)
A53/X52C Coiled Line Pipe
3 Layer Polypropylene Coating

LENGTH

78,200 feet

DJ Basin Multi Flowline Project Case Study