Coiled Line Pipe Case Study: Cost Savings and Speed in the Permian Basin

ur customer needed a fuel gas line completed in the Permian Basin – a complex project that had to be completed quickly and on a tight budget. Due to the versatility and cost-savings that Coiled Line Pipe provides, they not only saved more than 12.5% when compared to steel pipe installation, they also saved time and drastically reduced their HSEQ risks in the field. Learn more about the no-hassle solution our Coiled Line Pipe delivers, highlighted in a recent case study, Cost Savings and Speed in the Permian Basin#pipelines #oilandgas #steelflowline